Scope limits: Equipment scope
Provide top and bottom diameters, height, rim form, volume, coated-board and bottom-board grades, and whether cups are round or non-round. Name how blanks arrive and how formed cups leave. If double-wall insulation is required, say whether sleeve-forming and joining must be quoted with the forming station. Work envelope, footprint, connected load, three-phase supply, compressed air demand and any PLC interface belong in the same brief. Official pages observed on 17 September 2026 list optional leak, counting and stacking units; those modules are not assumed included.
Price exclusions
Do not assume punching, vacuum, cooling, leak testers, counting, stacking, packing, extra size tooling, installation or training sit inside a base machine price. Certification documents, if required for the destination, are requested from the named factory; they are not this website’s credentials. We do not publish a percentage saving versus “market” because no matched quote set exists for this site.